Thursday, September 17, 2009

build process week of 9.15-9.19

the contractor's portion is coming to an end as they are finishing up some details: walls are primed and we are waiting to pass inspection from the city. within the next week or two we will be able to start our work within the store: painting, installing carpet, installing the built-ins and then move in the final fixtures and merchandise the apparel and accessories!

since the fall semester has started at uncg- two of the studio classes within the interior architecture department has agreed to assist matt and i with the final design details of the store in order to prepare for opening. stoel burrows's studio class will be assisting us with the mid-floor fixtures by 'tweaking' the designs matt and i have already started. the students will then build the actual fixtures to be placed within the store. suzanne cabrera's class is assisting us with the marketing of the store as well as the in store displays and merchandising. please visit their class blog to read updates on their process.


front of the house: front window

front of the house: cash wrap wall

back of the house

No comments:

Post a Comment